Skip to main content

ASU Electronic Theses and Dissertations


This collection includes most of the ASU Theses and Dissertations from 2011 to present. ASU Theses and Dissertations are available in downloadable PDF format; however, a small percentage of items are under embargo. Information about the dissertations/theses includes degree information, committee members, an abstract, supporting data or media.

In addition to the electronic theses found in the ASU Digital Repository, ASU Theses and Dissertations can be found in the ASU Library Catalog.

Dissertations and Theses granted by Arizona State University are archived and made available through a joint effort of the ASU Graduate College and the ASU Libraries. For more information or questions about this collection contact or visit the Digital Repository ETD Library Guide or contact the ASU Graduate College at gradformat@asu.edu.


Mime Type
  • application/pdf
Date Range
2010 2019


Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e. Sprayed Polyurethane Foam Roofs (SPF roofs). Thirty seven urethane coated SPF roofs that were installed in 2005 / 2006 were visually inspected to measure the percentage of blisters and repairs three times over a period of 4 year, 6 year and 7 year marks. A repairing criteria was established after …

Contributors
Gajjar, Dhaval, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2013

This dissertation examines an analytical methodology that considers predictive maintenance on industrial facilities equipment to exceed world class availability standards with greater understanding for organizational participation impacts. The research for this study was performed at one of the world's largest semiconductor facilities, with the intent of understanding one possible cause for a noticeable behavior in technical work routines. Semiconductor manufacturing disruption poses significant potential revenue loss on a scale easily quantified in millions of dollars per hour. These instances are commonly referred to as "Interruption to production" (ITP). ITP is a standardized metric used across Company ABC's worldwide factory network …

Contributors
Mcdonald, Doug, Sullivan, Kenneth, Badger, William, et al.
Created Date
2012

The workforce demographics are changing as a large portion of the population is approaching retirement and thus leaving vacancies in the construction industry. Succession planning is an aspect of talent management which aims to mitigate instability faced by a company when a new successor fills a vacancy. Research shows that in addition to a diminishing pool of available talent, the industry does not have widespread, empirically tested and implemented models that lead to effective successions. The objective of this research was to create a baseline profile for succession planning in the construction industry by identifying currently implemented best practices. The …

Contributors
Gunnoe, Jake Alan, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2015

The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving technology, and changing organizational structures. The future PM will respond to these emerging challenges using a combination of fourteen competencies. The competencies are grouped into four categories: technical (multi-disciplined, practical understanding of technology), management (keen business insight, understanding of project management, knowledge network building, continuous risk monitoring), cognitive (complex decisions …

Contributors
King, Cynthia Joyce, Wiezel, Avi, Badger, William, et al.
Created Date
2012

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the …

Contributors
Paladugu, Bala Sai Krishna, El Asmar, Mounir, Ernzen, James, et al.
Created Date
2015

Real time project management has been underutilized as a tool to help youth grow personally and professionally. The thesis Real Time Project Management (PM) for Youth from Low Income Single Parent Households develops a study that seeks to result in a higher percentage of youth attending and completing college. The concept is to have youth from low income single parent households work as project managers each summer doing real time small projects for private companies. The youth would start at age 14 and conclude at age 18. They would do five summers of project management, managing small projects each summer …

Contributors
SHAPIRO, SETH, Sullivan, Kenneth, Stone, Brian, et al.
Created Date
2018

The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published advances in project management approaches and tools, project performance continues to suffer. This research seeks to conduct an exploratory analysis of current project management and other approaches and determine how they affect project performance. Through a detailed literature search, the researcher identified a procurement model that is more heavily documented …

Contributors
Rivera, Alfredo Octavio, Badger, William, Sullivan, Kenneth, et al.
Created Date
2017

Standardized processes for training and accountability, for an Environmental Services department within a healthcare system, were implemented to see the impact they would have on key performance indicators (KPIs). The KPIs involved infection rate for hospital acquired Clostridium Difficile (CDI), cleaning verification compliance, patient satisfaction, concerning the cleaning of their environment, and employee turnover. The results show that standardizing training and an accountability measure can have a significant impact on turnover, contribute to the reduction in CDI cases, ensure cleaning is performed at a high level and that the patient perception requires additional tools to meet their expectations on a …

Contributors
Ziffer, Steven, Sullivan, Kenneth, Smithwick, Jake, et al.
Created Date
2017

Facilities Management (FM) around the globe at different companies in different industries are often forced to make difficult decisions on whether or not to transition a workplace environment and how to decide what factors of a workplace environment can benefit or hinder a company's productivity. The data and research presented within this paper are targeted at aiding and educating FM in determining what factors to consider in a workplace transition to an open-seating design and validate the importance of recognizing how these factors impact the productivity of the individual and the organization. Data contained in this paper was gathered through …

Contributors
Thalin, William, Sullivan, Kenneth, Smithwick, Jake, et al.
Created Date
2017

Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects is the Saudi procurement system. The Saudi procurement system only selects contracts based on the lowest bid price offered. However, the Saudi procurement system has been found to not only produce delayed low quality projects, but also has resulted in higher costs. This paper shows how to modify the Saudi …

Contributors
Alofi, Ahmed Abdulrahman M, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2015