This collection includes most of the ASU Theses and Dissertations from 2011 to present. ASU Theses and Dissertations are available in downloadable PDF format; however, a small percentage of items are under embargo. Information about the dissertations/theses includes degree information, committee members, an abstract, supporting data or media.

In addition to the electronic theses found in the ASU Digital Repository, ASU Theses and Dissertations can be found in the ASU Library Catalog.

Dissertations and Theses granted by Arizona State University are archived and made available through a joint effort of the ASU Graduate College and the ASU Libraries. For more information or questions about this collection contact or visit the Digital Repository ETD Library Guide or contact the ASU Graduate College at gradformat@asu.edu.


Date Range
2010 2019


With increasing interest in sustainability and green building, organizations are implementing programs such as Leadership in Energy and Environmental Design for Existing Buildings: Operations and Maintenance (LEED-EB) in order to focus corporate sustainability goals on the operations of a facility and the practices of the building occupants. Green building programs help reduce the impact of a facility and bring about several environmental benefits including but not limited to energy conservation, water conservation and material conservation. In addition to various environmental benefits, green building programs can help companies become more efficient. The problem is that organizations are not always successful in …

Contributors
Furphy, Kimberly, Hild, Nicholas, Olson, Larry, et al.
Created Date
2010

The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors and simultaneously increase project performance. The research proposes that a leadership based structure can supplement the perception, preplanning, and risk minimization capability of a contractor's project manager, thus increasing the project performance (on time, within budget, and meeting expectations) and decreasing client management requirement. The projects were delivered in a best …

Contributors
Malhotra, Neha, Kashiwagi, Dean T, Sullivan, Kenneth, et al.
Created Date
2010

Current information on successful leadership and management practices is contradictory and inconsistent, which makes difficult to understand what successful business practices are and what are not. The purpose of this study is to identify a simple process that quickly and logically identifies consistent and inconsistent leadership and management criteria. The hypothesis proposed is that Information Measurement Theory (IMT) along with the Kashiwagi Solution Model (KSM) is a methodology than can differentiate between accurate and inaccurate principles the initial part of the study about authors in these areas show how information is conflictive, and also served to establish an initial baseline …

Contributors
Reynolds, Harry, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2011

The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The price based/management and control paradigm has not worked. Clients have now been moving toward the best value environment (hire contractors who know what they are doing, who preplan, and manage and minimize risk and deviation.) Owners are trying to move from client direction and control to hiring an expert and allowing them to do the quality control/risk management. The movement of environments changes the paradigm for the contractors from a reactive to …

Contributors
Pauli, Michele, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2011

ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of their organizations. This thesis will discuss the important and flexible use of measurement and leadership reports and the benefits of justifying the work required to maintain or upgrade a facility. The task is streamlined by invoking accountability to subject experts. The facility manager must trust in the ability of his or her work force to get the job done. However, …

Contributors
Tellefsen, Thor, Sullivan, Kenneth, Kashiwagi, Dean, et al.
Created Date
2011

ABSTRACT There has been plenty written on the topic of process management in business. This study focuses more on the need to research and develop a model to establish "balance" in process. Reengineering process and investing capital into current technology does not improve the outcome of process alone. The actual process activity coupled with human interface combined with technology determines the outcome of processes, however they do not indicate whether it is a balanced process or not. Wherein the word balance really means sustainable for long periods of time and easily reproduced by others. This study argues for the need …

Contributors
Jeffers, Anthony Alan, Sullivan, Kenneth, Badger, Bill, et al.
Created Date
2012

The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving technology, and changing organizational structures. The future PM will respond to these emerging challenges using a combination of fourteen competencies. The competencies are grouped into four categories: technical (multi-disciplined, practical understanding of technology), management (keen business insight, understanding of project management, knowledge network building, continuous risk monitoring), cognitive (complex decisions …

Contributors
King, Cynthia Joyce, Wiezel, Avi, Badger, William, et al.
Created Date
2012

This dissertation examines an analytical methodology that considers predictive maintenance on industrial facilities equipment to exceed world class availability standards with greater understanding for organizational participation impacts. The research for this study was performed at one of the world's largest semiconductor facilities, with the intent of understanding one possible cause for a noticeable behavior in technical work routines. Semiconductor manufacturing disruption poses significant potential revenue loss on a scale easily quantified in millions of dollars per hour. These instances are commonly referred to as "Interruption to production" (ITP). ITP is a standardized metric used across Company ABC's worldwide factory network …

Contributors
Mcdonald, Doug, Sullivan, Kenneth, Badger, William, et al.
Created Date
2012

Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e. Sprayed Polyurethane Foam Roofs (SPF roofs). Thirty seven urethane coated SPF roofs that were installed in 2005 / 2006 were visually inspected to measure the percentage of blisters and repairs three times over a period of 4 year, 6 year and 7 year marks. A repairing criteria was established after …

Contributors
Gajjar, Dhaval, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2013

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired …

Contributors
Nihas, Syed, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2013

Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to test the areas of Time, Waste, Quality, Safety, and Satisfaction of different volunteer groups. The challenge was bolstered by giving the teams no power tools and limited available resources. A simple design of experiment model was used to test highs and lows in the three management techniques of Instruction, Help, …

Contributors
Prigge V, Diedrich, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2013

Effective collection and dissemination of project information, including best practices, help increase the likelihood of project performance and are vital to organizations in the architecture-engineering-construction (AEC) industry. Best practices can help improve project performance, yet these practices are not universally implemented and used in the industry, due to the following: 1) not all practices are applicable to every project or organization, 2) knowledge lost in organizational turnover which leads to inconsistent collection and implementation of best practices and 3) the lack of standardized processes for best practice management in an organization. This research, sponsored by National Academy of Construction, the …

Contributors
Bosfield, Roberta, Gibson, Edd, Chester, Mikhail, et al.
Created Date
2014

Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management effort. Research in the field of organizational behavior cautions that perhaps more than half of all organizational change efforts fail to accomplish their intended objectives. This study utilizes an action research approach to analyze change message delivery within owner organizations, model owner project team readiness and adoption of change, and …

Contributors
Lines, Brian, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2014

Construction Management research has not been successful in changing the practices of the construction industry. The method of receiving grants and the peer review paper system that academics rely on to achieve promotion, does not align to academic researchers becoming experts who can bring change to industry practices. Poor construction industry performance has been documented for the past 25 years in the international construction management field. However, after 25 years of billions of dollars of research investment, the solution remains elusive. Research has shown that very few researchers have a hypothesis, run cycles of research tests in the industry, and …

Contributors
Rivera, Alfredo Octavio, Kashiwagi, Dean T, Sullivan, Kenneth, et al.
Created Date
2014

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the …

Contributors
Paladugu, Bala Sai Krishna, El Asmar, Mounir, Ernzen, James, et al.
Created Date
2015

The workforce demographics are changing as a large portion of the population is approaching retirement and thus leaving vacancies in the construction industry. Succession planning is an aspect of talent management which aims to mitigate instability faced by a company when a new successor fills a vacancy. Research shows that in addition to a diminishing pool of available talent, the industry does not have widespread, empirically tested and implemented models that lead to effective successions. The objective of this research was to create a baseline profile for succession planning in the construction industry by identifying currently implemented best practices. The …

Contributors
Gunnoe, Jake Alan, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2015

Energy performance and efficiency plays of major role in the operations of K-12 schools, as it is a significant expense and a source of budgetary pressure upon schools. Energy performance is tied to the physical infrastructure of schools, as well as the operational and behavioral patterns they accommodate. Little documentation exists within the existing literature on the measured post-occupancy performance of schools once they have begun measuring and tracking their energy performance. Further, little is known about the patterns of change over time in regard to energy performance and whether there is differentiation in these patterns between school districts. This …

Contributors
Thurston, Anna, Sullivan, Kenneth, Okamura, Patrick, et al.
Created Date
2015

ABSTRACT The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties worldwide and in Saudi Arabia, as well as to give recommendation according to the outcomes of this research. The causes of litigious behavior in Saudi Arabia and other countries around the world were identified and documented, also the differences in litigation of the Saudi Arabian construction industry as compared to …

Contributors
Almutairi, Saud, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2015

Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects is the Saudi procurement system. The Saudi procurement system only selects contracts based on the lowest bid price offered. However, the Saudi procurement system has been found to not only produce delayed low quality projects, but also has resulted in higher costs. This paper shows how to modify the Saudi …

Contributors
Alofi, Ahmed Abdulrahman M, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2015

Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other Gulf countries as well. Data were obtained from 49 infrastructure projects that were undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified in this study and these factors were grouped into four categories. The average delay in infrastructure …

Contributors
Elawi, Ghazi, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2015