This collection includes most of the ASU Theses and Dissertations from 2011 to present. ASU Theses and Dissertations are available in downloadable PDF format; however, a small percentage of items are under embargo. Information about the dissertations/theses includes degree information, committee members, an abstract, supporting data or media.

In addition to the electronic theses found in the ASU Digital Repository, ASU Theses and Dissertations can be found in the ASU Library Catalog.

Dissertations and Theses granted by Arizona State University are archived and made available through a joint effort of the ASU Graduate College and the ASU Libraries. For more information or questions about this collection contact or visit the Digital Repository ETD Library Guide or contact the ASU Graduate College at gradformat@asu.edu.


Date Range
2010 2018


The discipline of continuing professional development (CPD) is well defined and established within a variety of industries, such as medical, legal, and financial. The built environment is a less defined and mature industry with respect to educational pathways and professional education, with no uniform structure. Occupational licensing, such as registered nurses, certified professional accountants, and others are well known within both their industries and the public. Additionally, occupational core-competencies are well established. Planning is a core skill set within the built environment and construction management. Definitions of the term “planning” vary quite broadly across the built environment, but generally includes …

Contributors
Hurtado, Kristen Caroline, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2018

Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the …

Contributors
Algahtany, Mohammed, Sullivan, Kenneth, Kashiwagi, Dean, et al.
Created Date
2018

The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published advances in project management approaches and tools, project performance continues to suffer. This research seeks to conduct an exploratory analysis of current project management and other approaches and determine how they affect project performance. Through a detailed literature search, the researcher identified a procurement model that is more heavily documented …

Contributors
Rivera, Alfredo Octavio, Badger, William, Sullivan, Kenneth, et al.
Created Date
2017

Public construction projects in Saudi Arabia have been experiencing performance issues for the past 30 years. There have been many research efforts and publications identifying the problem and potential causes, however, there have been minimal efforts identifying how to mitigate the problem and testing to validate proposed solutions. A literature search has shown that the academic research has had minimal impact in assisting the construction industry to improve its performance. This dissertation aimed to evaluate the impact of construction management research in Saudi construction industry (SCI), and to investigate barriers that hinder the diffusion of implementing the research outcomes in …

Contributors
Alhammadi, Yasir, Kashiwagi, Dean, Badger, William, et al.
Created Date
2017

The objective of the study was to examine the impact construction document deficiencies have on heavy/civil low-bid infrastructure projects. It encompasses the expertise of 202 heavy/civil construction professionals comprised of contactors and public project owners. The study was designed to determine the frequency and timing of when a contractor discovers construction document deficiencies on heavy/civil low bid projects. The information was correlated with further study data of when a contractor ultimately reports the discovered construction document deficiencies to the public project owner. This research data was compiled and analyzed to determine if contractors are withholding construction document deficiencies from public …

Contributors
Pesek, Anthony Edward, Sullivan, Kenneth, Badger, William, et al.
Created Date
2017

Owner organizations in the architecture, engineering, and construction (AEC) industry are presented with a wide variety of project delivery approaches. Implementation of these approaches, while enticing due to their potential to save money, reduce schedule delays, or improve quality, is extremely difficult to accomplish and requires a concerted change management effort. Research in the field of organizational behavior cautions that perhaps more than half of all organizational change efforts fail to accomplish their intended objectives. This study utilizes an action research approach to analyze change message delivery within owner organizations, model owner project team readiness and adoption of change, and …

Contributors
Lines, Brian, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2014

Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e. Sprayed Polyurethane Foam Roofs (SPF roofs). Thirty seven urethane coated SPF roofs that were installed in 2005 / 2006 were visually inspected to measure the percentage of blisters and repairs three times over a period of 4 year, 6 year and 7 year marks. A repairing criteria was established after …

Contributors
Gajjar, Dhaval, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2013

Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to test the areas of Time, Waste, Quality, Safety, and Satisfaction of different volunteer groups. The challenge was bolstered by giving the teams no power tools and limited available resources. A simple design of experiment model was used to test highs and lows in the three management techniques of Instruction, Help, …

Contributors
Prigge V, Diedrich, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2013

The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving technology, and changing organizational structures. The future PM will respond to these emerging challenges using a combination of fourteen competencies. The competencies are grouped into four categories: technical (multi-disciplined, practical understanding of technology), management (keen business insight, understanding of project management, knowledge network building, continuous risk monitoring), cognitive (complex decisions …

Contributors
King, Cynthia Joyce, Wiezel, Avi, Badger, William, et al.
Created Date
2012

This dissertation examines an analytical methodology that considers predictive maintenance on industrial facilities equipment to exceed world class availability standards with greater understanding for organizational participation impacts. The research for this study was performed at one of the world's largest semiconductor facilities, with the intent of understanding one possible cause for a noticeable behavior in technical work routines. Semiconductor manufacturing disruption poses significant potential revenue loss on a scale easily quantified in millions of dollars per hour. These instances are commonly referred to as "Interruption to production" (ITP). ITP is a standardized metric used across Company ABC's worldwide factory network …

Contributors
Mcdonald, Doug, Sullivan, Kenneth, Badger, William, et al.
Created Date
2012