Skip to main content

ASU Electronic Theses and Dissertations


This collection includes most of the ASU Theses and Dissertations from 2011 to present. ASU Theses and Dissertations are available in downloadable PDF format; however, a small percentage of items are under embargo. Information about the dissertations/theses includes degree information, committee members, an abstract, supporting data or media.

In addition to the electronic theses found in the ASU Digital Repository, ASU Theses and Dissertations can be found in the ASU Library Catalog.

Dissertations and Theses granted by Arizona State University are archived and made available through a joint effort of the ASU Graduate College and the ASU Libraries. For more information or questions about this collection contact or visit the Digital Repository ETD Library Guide or contact the ASU Graduate College at gradformat@asu.edu.


Date Range
2010 2019


Research has shown that construction projects in Saudi Arabia have had a perceived poor performance for the past three decades, from 1970-2016. The Saudi construction industry relies on a Contractor Classification System (CCS) to determine contractors’ capabilities, and prevent underperformance. Through this study, a survey was conducted among persons involved in the Saudi Arabian construction industry to identify the perception of the performance of the Saudi Arabian construction industry, and the satisfaction with the CCS. The results of the survey showed that 71.59% of the participants agreed that the CCS does not accurately assess contractors’ capabilities for projects they are …

Contributors
Almutairi, Saud, Kashiwagi, Dean, Kashiwagi, Jacob, et al.
Created Date
2017

ABSTRACT The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA government. A questionnaire has been developed and carefully designed based on literature review. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken and to improve the current SA procurement system. The questionnaire was sent out to …

Contributors
Alofi, Ahmed Abdulrahman, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2017

The objective of the study was to examine the impact construction document deficiencies have on heavy/civil low-bid infrastructure projects. It encompasses the expertise of 202 heavy/civil construction professionals comprised of contactors and public project owners. The study was designed to determine the frequency and timing of when a contractor discovers construction document deficiencies on heavy/civil low bid projects. The information was correlated with further study data of when a contractor ultimately reports the discovered construction document deficiencies to the public project owner. This research data was compiled and analyzed to determine if contractors are withholding construction document deficiencies from public …

Contributors
Pesek, Anthony Edward, Sullivan, Kenneth, Badger, William, et al.
Created Date
2017

The workforce demographics in the United States are rapidly changing. According to census information, 35% of working adults are project to retire within the next 20 years. The construction is being particularly affected by this demographic shift as fewer employees are entering into the industry. This shift is especially bad among project professionals within the industry. The response to these changing demographics depends on how companies manage their talent and plan for successions. In order to investigate this workforce problem in the construction industry, the author has partnered with an expert panel of human resource executives from various companies in …

Contributors
Gunnoe, Jake Alan, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2017

The purpose of this paper is to present a case study on the application of the Lean Six Sigma (LSS) quality improvement methodology and tools to study the analysis and improvement of facilities management (FM) services at a healthcare organization. Research literature was reviewed concerning whether or not LSS has been applied in healthcare-based FM, but no such studies have been published. This paper aims to address the lack of an applicable methodology for LSS intervention within the context of healthcare-based FM. The Define, Measure, Analyze, Improve, and Control (DMAIC) framework was followed to test the hypothesis that LSS can …

Contributors
Shirey, William T., Sullivan, Kenneth, Smithwick, Jake, et al.
Created Date
2017

To present the importance of understanding American commercial influence through the utilization of geopolitics while referencing the economic viability and public policy in Organization of Petroleum Exporting Countries nations, relative to oil production, consumption and the price per barrel. For the purpose, of successfully completing western led hydrocarbon construction activities Internationally. Additionally, this thesis will theorize several non-traditional strategies that will allow western led construction contractors and managers to effectively maintain and foster relationships with international trade labor. Allowing for more insight and project planning to complete successful and safe projects. Dissertation/Thesis

Contributors
Apt, Michael, Sullivan, Kenneth, Lines, Brian, et al.
Created Date
2017

Research has shown roofing systems with high solar reflectance and thermal emissivity lead to less heat absorption, a consequential reduction in cooling load demand, and a resultant reduction on energy expenditure. Studies on energy savings from cool roof coatings have been conducted for decades and when compared to more traditional roofing systems have demonstrated energy savings ranging from 2-40%, with average savings estimated at 20%. The 20% average is widely used by cool roof industry professionals, designers, and contractors to market and sell the technology in the commercial sector to owners and owner representatives researching new roofs. While the 20% …

Contributors
Haverstic, Preston Todd, Sullivan, Kenneth, Okamura, Patrick, et al.
Created Date
2016

For decades, load shifting control, one of the most effective peak demand management methods, has attracted attention from both researchers and engineers. Various load shifting controls have been developed and introduced in mainly commercial buildings. Utility companies typically penalize consumers with “demand rates”. This along with increased population and increased customer energy demand will only increase the need for load shifting. There have been many white papers, thesis papers and case studies written on the different types of Thermal Energy Storage and their uses. Previous papers have been written by Engineers, Manufacturers and Researchers. This thesis paper is unique because …

Contributors
Whitcraft, Daniel Scott, Sullivan, Kenneth, Okamura, Patrick, et al.
Created Date
2016

Entering a new market in the construction industry is a complex task. Although many contractors have experienced the benefits of expanding their market offerings, many more have had unsuccessful experiences causing hardship for the entire organization. Standardized decision-making processes can help to increase the likelihood of success, but few specialty contractors have taken the time to develop a formal procedure. According to this research, only 6 percent of survey respondents and 7 percent of case study participants from the sheet metal industry have a formal decision process. Five sources of data (existing literature, industry survey, semi-structured interviews, factor prioritization workshops, …

Contributors
Sullivan, Jera Jo, El Asmar, Mounir, Gibson, G Edward, et al.
Created Date
2016

A roofing manufacturer wants to differentiate themselves from other roofing manufacturers based on performance information. However, construction industry has revealed poor performance documentation in the last couple of decades. With no current developed performance measurement model in the industry, two roofing manufacturers approached the research group to implement a warranty program that measures the performance information of their systems and applicators. Moreover, the success of any project in the construction industry heavily relies upon the capability of the contractor(s) executing the project. Low-performing contractors are correlated with increased cost and delayed schedules, resulting in end-user dissatisfaction with the final product. …

Contributors
Gajjar, Dhaval, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2016