This collection includes most of the ASU Theses and Dissertations from 2011 to present. ASU Theses and Dissertations are available in downloadable PDF format; however, a small percentage of items are under embargo. Information about the dissertations/theses includes degree information, committee members, an abstract, supporting data or media.

In addition to the electronic theses found in the ASU Digital Repository, ASU Theses and Dissertations can be found in the ASU Library Catalog.

Dissertations and Theses granted by Arizona State University are archived and made available through a joint effort of the ASU Graduate College and the ASU Libraries. For more information or questions about this collection contact or visit the Digital Repository ETD Library Guide or contact the ASU Graduate College at gradformat@asu.edu.




Construction work is ergonomically hazardous, as it requires numerous awkward postures, heavy lifting and other forceful exertions. Prolonged repetition and overexertion have a cumulative effect on workers often resulting in work related musculoskeletal disorders (WMSDs). The United States spends approximately $850 billion a year on WMSDs. Mechanical installation workers experience serious overexertion injuries at rates exceeding the national average for all industries and all construction workers, and second only to laborers. The main contributing factors of WMSDs are ergonomic loads and extreme stresses due to incorrect postures. The motivation for this study is to reduce the WMSDs among mechanical system …

Contributors
Hussain, Sanaa Fatima, Mitropoulos, Panagiotis, Wiezel, Avi, et al.
Created Date
2011

Front end planning (FEP) is an essential and valuable process that helps identify risks early in the capital project planning phases. With effective FEP, risks can potentially be mitigated through development of detailed scope definition and subsequent efficient project resource use. The thesis describes the FEP process that has been developed over the past twenty years by the Construction Industry Institute (CII). Specifically, it details the FEP tools developed for early project planning and the data gathered to analyze the tools used within the CII community. Data from a March 2011 survey are given showing the tools commonly used, how …

Contributors
Bosfield, Roberta, Gibson, G.Edward, Wiezel, Avi, et al.
Created Date
2012

The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was to create an understanding of high reliability construction work systems based on lessons from the production practices of high performance work crews. High performance work crews are defined as the work crews that constantly reach and maintain a high level of productivity and exceptional safety record while delivering high quality …

Contributors
Memarian, Babak, Bashford, Howard, Boren, Rebecca, et al.
Created Date
2012

The goal of this research study was to identify the competencies the Project Manager (PM) will need to respond to the challenges the construction industry faces in 2022 and beyond. The study revealed twenty-one emerging challenges for construction PMs grouped into four primary disruptive forces: workforce demographics, globalization, rapidly evolving technology, and changing organizational structures. The future PM will respond to these emerging challenges using a combination of fourteen competencies. The competencies are grouped into four categories: technical (multi-disciplined, practical understanding of technology), management (keen business insight, understanding of project management, knowledge network building, continuous risk monitoring), cognitive (complex decisions …

Contributors
King, Cynthia Joyce, Wiezel, Avi, Badger, William, et al.
Created Date
2012

Qualifications based selection (QBS) of construction services uses a variety of criteria to evaluate proponents and select a contractor for the project. The criteria typically fall into three categories: past performance and technical capability, key personnel, and price, with price often being considered the most important factor in selection. Evaluation and the merits of the key personnel category is not well described or discussed in research. Prior research has investigated the evaluation criteria elements and their ability to differentiate proponents. This case study uses QBS evaluation data from fifty-eight construction projects to show that use of a structured interview process …

Contributors
Sawyer, Jeff Thomas, Sullivan, Kennth S, Wiezel, Avi, et al.
Created Date
2014

The workforce demographics are changing as a large portion of the population is approaching retirement and thus leaving vacancies in the construction industry. Succession planning is an aspect of talent management which aims to mitigate instability faced by a company when a new successor fills a vacancy. Research shows that in addition to a diminishing pool of available talent, the industry does not have widespread, empirically tested and implemented models that lead to effective successions. The objective of this research was to create a baseline profile for succession planning in the construction industry by identifying currently implemented best practices. The …

Contributors
Gunnoe, Jake Alan, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2015

The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the workplace, Social Exchange Theory introduces two types of exchanges: employee-organization and leader-member exchanges. While both types of exchanges focus exclusively on the employee’s longitudinal relationships, the interpersonal relationships among the team members are usually overlooked. This research presents the results of a quantitative study of the interpersonal relationships of 327 …

Contributors
K. Jamali, M. Hossein, Wiezel, Avi, Sullivan, Kenneth T., et al.
Created Date
2019