This collection includes most of the ASU Theses and Dissertations from 2011 to present. ASU Theses and Dissertations are available in downloadable PDF format; however, a small percentage of items are under embargo. Information about the dissertations/theses includes degree information, committee members, an abstract, supporting data or media.

In addition to the electronic theses found in the ASU Digital Repository, ASU Theses and Dissertations can be found in the ASU Library Catalog.

Dissertations and Theses granted by Arizona State University are archived and made available through a joint effort of the ASU Graduate College and the ASU Libraries. For more information or questions about this collection contact or visit the Digital Repository ETD Library Guide or contact the ASU Graduate College at gradformat@asu.edu.


The overall purpose of this investigation is to examine the differences between the Best Value Approach and Best Value Procurement, and to test if the Best Value Approach can be used for the successful delivery of roofing systems. Best Value Procurement has been run on delivering roofing services for many years. However, in the last three years, it was discovered that Best Value Procurement was not sustainable and filled with risk. To examine if the Best Value Approach can be used for the successful delivery of roofing systems, the researcher identified a client in need of a new 70,000 sq. …

Contributors
Bills, Andrew Marius, Sullivan, Ken, Badger, William, et al.
Created Date
2017

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found …

Contributors
Alzara, Majed Abdulrahman, Kashiwagi, Dean, Kashiwagi, Jacob, et al.
Created Date
2016

A roofing manufacturer wants to differentiate themselves from other roofing manufacturers based on performance information. However, construction industry has revealed poor performance documentation in the last couple of decades. With no current developed performance measurement model in the industry, two roofing manufacturers approached the research group to implement a warranty program that measures the performance information of their systems and applicators. Moreover, the success of any project in the construction industry heavily relies upon the capability of the contractor(s) executing the project. Low-performing contractors are correlated with increased cost and delayed schedules, resulting in end-user dissatisfaction with the final product. …

Contributors
Gajjar, Dhaval, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2016

ABSTRACT The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties worldwide and in Saudi Arabia, as well as to give recommendation according to the outcomes of this research. The causes of litigious behavior in Saudi Arabia and other countries around the world were identified and documented, also the differences in litigation of the Saudi Arabian construction industry as compared to …

Contributors
Almutairi, Saud, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2015

Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other Gulf countries as well. Data were obtained from 49 infrastructure projects that were undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified in this study and these factors were grouped into four categories. The average delay in infrastructure …

Contributors
Elawi, Ghazi, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2015

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired …