Skip to main content

ASU Electronic Theses and Dissertations


This collection includes most of the ASU Theses and Dissertations from 2011 to present. ASU Theses and Dissertations are available in downloadable PDF format; however, a small percentage of items are under embargo. Information about the dissertations/theses includes degree information, committee members, an abstract, supporting data or media.

In addition to the electronic theses found in the ASU Digital Repository, ASU Theses and Dissertations can be found in the ASU Library Catalog.

Dissertations and Theses granted by Arizona State University are archived and made available through a joint effort of the ASU Graduate College and the ASU Libraries. For more information or questions about this collection contact or visit the Digital Repository ETD Library Guide or contact the ASU Graduate College at gradformat@asu.edu.


Date Range
2011 2018


Recent studies have identified that contractors in the Saudi construction industry are not the main party that cause risks as owners and other parties have the major share of causing risks. However, with the identification that risks out of contractors’ control are a leading cause of low performance, there is a lack of efficient risk mitigation practices in Saudi to manage these risks. The main aim of this dissertation is to assess the current practices applied by contractors to minimize risk out of their control and develop a risk mitigation model to manage these risks. The main objectives of the …

Contributors
Algahtany, Mohammed, Sullivan, Kenneth, Kashiwagi, Dean, et al.
Created Date
2018

The workforce demographics in the United States are rapidly changing. According to census information, 35% of working adults are project to retire within the next 20 years. The construction is being particularly affected by this demographic shift as fewer employees are entering into the industry. This shift is especially bad among project professionals within the industry. The response to these changing demographics depends on how companies manage their talent and plan for successions. In order to investigate this workforce problem in the construction industry, the author has partnered with an expert panel of human resource executives from various companies in …

Contributors
Gunnoe, Jake Alan, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2017

The purpose of this paper is to present a case study on the application of the Lean Six Sigma (LSS) quality improvement methodology and tools to study the analysis and improvement of facilities management (FM) services at a healthcare organization. Research literature was reviewed concerning whether or not LSS has been applied in healthcare-based FM, but no such studies have been published. This paper aims to address the lack of an applicable methodology for LSS intervention within the context of healthcare-based FM. The Define, Measure, Analyze, Improve, and Control (DMAIC) framework was followed to test the hypothesis that LSS can …

Contributors
Shirey, William T., Sullivan, Kenneth, Smithwick, Jake, et al.
Created Date
2017

Standardized processes for training and accountability, for an Environmental Services department within a healthcare system, were implemented to see the impact they would have on key performance indicators (KPIs). The KPIs involved infection rate for hospital acquired Clostridium Difficile (CDI), cleaning verification compliance, patient satisfaction, concerning the cleaning of their environment, and employee turnover. The results show that standardizing training and an accountability measure can have a significant impact on turnover, contribute to the reduction in CDI cases, ensure cleaning is performed at a high level and that the patient perception requires additional tools to meet their expectations on a …

Contributors
Ziffer, Steven, Sullivan, Kenneth, Smithwick, Jake, et al.
Created Date
2017

ABSTRACT The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA government. A questionnaire has been developed and carefully designed based on literature review. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken and to improve the current SA procurement system. The questionnaire was sent out to …

Contributors
Alofi, Ahmed Abdulrahman, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2017

The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published advances in project management approaches and tools, project performance continues to suffer. This research seeks to conduct an exploratory analysis of current project management and other approaches and determine how they affect project performance. Through a detailed literature search, the researcher identified a procurement model that is more heavily documented …

Contributors
Rivera, Alfredo Octavio, Badger, William, Sullivan, Kenneth, et al.
Created Date
2017

ABSTRACT The objective of this dissertation is to identify a recommended balance between leadership and management activities of a project manager who aims to rehabilitate a distressed construction project. The data for this research was collected from 338 construction project professionals belonging to fifteen large construction companies who participated in leadership seminars originated by professors from Arizona State University. The seminars contained various leadership games and exercises that were designed specifically to collect data about leadership and management actions taken by the project managers. The data from one of the games, called “Project from Hell” (PFH), was used in this …

Contributors
Behzad, Navid, Wiezel, Avi, Gibson, Jr., G. Edward, et al.
Created Date
2016

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the …

Contributors
Paladugu, Bala Sai Krishna, El Asmar, Mounir, Ernzen, James, et al.
Created Date
2015

The workforce demographics are changing as a large portion of the population is approaching retirement and thus leaving vacancies in the construction industry. Succession planning is an aspect of talent management which aims to mitigate instability faced by a company when a new successor fills a vacancy. Research shows that in addition to a diminishing pool of available talent, the industry does not have widespread, empirically tested and implemented models that lead to effective successions. The objective of this research was to create a baseline profile for succession planning in the construction industry by identifying currently implemented best practices. The …

Contributors
Gunnoe, Jake Alan, Sullivan, Kenneth, Wiezel, Avi, et al.
Created Date
2015

Construction Management research has not been successful in changing the practices of the construction industry. The method of receiving grants and the peer review paper system that academics rely on to achieve promotion, does not align to academic researchers becoming experts who can bring change to industry practices. Poor construction industry performance has been documented for the past 25 years in the international construction management field. However, after 25 years of billions of dollars of research investment, the solution remains elusive. Research has shown that very few researchers have a hypothesis, run cycles of research tests in the industry, and …

Contributors
Rivera, Alfredo Octavio, Kashiwagi, Dean T, Sullivan, Kenneth, et al.
Created Date
2014