Skip to main content

ASU Electronic Theses and Dissertations


This collection includes most of the ASU Theses and Dissertations from 2011 to present. ASU Theses and Dissertations are available in downloadable PDF format; however, a small percentage of items are under embargo. Information about the dissertations/theses includes degree information, committee members, an abstract, supporting data or media.

In addition to the electronic theses found in the ASU Digital Repository, ASU Theses and Dissertations can be found in the ASU Library Catalog.

Dissertations and Theses granted by Arizona State University are archived and made available through a joint effort of the ASU Graduate College and the ASU Libraries. For more information or questions about this collection contact or visit the Digital Repository ETD Library Guide or contact the ASU Graduate College at gradformat@asu.edu.


Status
  • Public
Subject
Date Range
2010 2019


Construction Management research has not been successful in changing the practices of the construction industry. The method of receiving grants and the peer review paper system that academics rely on to achieve promotion, does not align to academic researchers becoming experts who can bring change to industry practices. Poor construction industry performance has been documented for the past 25 years in the international construction management field. However, after 25 years of billions of dollars of research investment, the solution remains elusive. Research has shown that very few researchers have a hypothesis, run cycles of research tests in the industry, and …

Contributors
Rivera, Alfredo Octavio, Kashiwagi, Dean T, Sullivan, Kenneth, et al.
Created Date
2014

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired …

Contributors
Nihas, Syed, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2013

ABSTRACT The current Saudi Arabian (SA) procurement system leads to many losses in money and benefits in projects. Also, the use of the traditional procurement system in SA has been identified as one of the causes for poor performance in the delivery of construction and the major risk to the SA government. A questionnaire has been developed and carefully designed based on literature review. The purpose of the survey was to identify the validity of the recent claims that the procurement system in SA is broken and to improve the current SA procurement system. The questionnaire was sent out to …

Contributors
Alofi, Ahmed Abdulrahman, Kashiwagi, Dean, Sullivan, Kenneth, et al.
Created Date
2017

The following is a case study composed of three workflow investigations at the open source software development (OSSD) based Apache Software Foundation (Apache). I start with an examination of the workload inequality within the Apache, particularly with regard to requirements writing. I established that the stronger a participant's experience indicators are, the more likely they are to propose a requirement that is not a defect and the more likely the requirement is eventually implemented. Requirements at Apache are divided into work tickets (tickets). In our second investigation, I reported many insights into the distribution patterns of these tickets. The participants …

Contributors
Panos, Ryan Charles, Collofello, James, Fowler, John, et al.
Created Date
2017

As global competition continues to grow more disruptive, organizational change is an ever-present reality that affects companies in all industries at both the operational and strategic level. Organizational change capabilities have become a necessary aspect of existence for organizations in all industries worldwide. Research suggests that more than half of all organizational change efforts fail to achieve their original intended results, with some studies quoting failure rates as high as 70 percent. Exasperating this problem is the fact that no single change methodology has been universally accepted. This thesis examines two aspect of organizational change: the implementation of tactical and …

Contributors
Lines, Brian, Sullivan, Kenneth T, Badger, William, et al.
Created Date
2011

Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry landscape, the need to deliver projects within technical, budgetary, and schedule requirements becomes imperative to sustain a healthy return on investment for the project stakeholders. The fact that information lags within the capital projects industry has motivated this research to find practices and solutions that facilitate Instantaneous Project Controls (IPC). The author …

Contributors
Abbaszadegan, Amin, Grau Torrent, David, El Asmar, Mounir, et al.
Created Date
2016

Agglomeration research has investigated a key research question, i.e., why do firms in a specific industry co-locate geographically? In the agglomeration literature, it has been assumed that each firm has one business establishment in a cluster such that firms always co-locate with competitors. However, it is often observed that firms operate several business establishments in a cluster, so they co-locate not only with competitors (i.e., inter-firm agglomeration) but also with their own business establishments (i.e., intra-firm agglomeration). While inter-firm agglomeration is a counterpart to the traditional concept of agglomeration, intra-firm agglomeration is a new concept in agglomeration research. The separation …

Contributors
Woo, Hyun-Soo, Cannella, Albert, Hoetker, Glenn, et al.
Created Date
2016

Knowledge advancement occurs when the creation of new and useful knowledge encompasses and supersedes earlier knowledge. A rapidly growing number of scholars with state-of-the-art research tools has led to the growth of knowledge exploration in almost every field. It, however, has been observed that the findings of new studies frequently differ from previously established evidence and even disagree with one another. Conflicting and contradictory results prevail in the literature. This phenomenon has puzzled many people with respect to which findings are reliable and which should be considered as valid. Inconclusive results in the literature inhibit, rather than facilitate, knowledge advancement …

Contributors
Hung, Chia-Ko, Hager, Mark, Lecy, Jesse, et al.
Created Date
2019

In my dissertation, I develop a theoretical model that explains how leaders' daily work demands and recovery affect their leadership behaviors. In a departure from the trait approach of leadership which suggests that leaders tend to behave in certain ways that are determined by their heritable characteristics such as personality and intelligence (e.g., Bono & Judge, 2002), and from the contingency approach that suggests leaders behave in ways that are most suitable to the situation based on the needs of followers and the demands of their tasks (e.g., House, 1971), this dissertation draws from the transactional theory of stress (Lazarus …

Contributors
Zhang, Yiwen, Lepine, Jeffery, Judge, Timothy, et al.
Created Date
2013

ABSTRACT The objective of this dissertation is to identify a recommended balance between leadership and management activities of a project manager who aims to rehabilitate a distressed construction project. The data for this research was collected from 338 construction project professionals belonging to fifteen large construction companies who participated in leadership seminars originated by professors from Arizona State University. The seminars contained various leadership games and exercises that were designed specifically to collect data about leadership and management actions taken by the project managers. The data from one of the games, called “Project from Hell” (PFH), was used in this …

Contributors
Behzad, Navid, Wiezel, Avi, Gibson, Jr., G. Edward, et al.
Created Date
2016