Description

This study is one in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to evaluate future parkways identified in the recently completed Maricopa Association of Governments framework studies. The project study area

This study is one in a series of long-range transportation planning studies being conducted by the Maricopa County Department of Transportation to evaluate future parkways identified in the recently completed Maricopa Association of Governments framework studies. The project study area includes the planned Northern Parkway, an east-west corridor centered on the Northern Avenue section line, from the planned Tonopah Parkway (411th Avenue alignment) to the planned Turner Parkway (267th Avenue alignment). The Northern Parkway corridor within the project study area is approximately 18 miles long and two miles wide. This section of Northern Parkway is referred to as the Northern Parkway Hassayampa section to distinguish it from other planned Northern Parkway sections east of the White Tank Mountains.

The project study area also includes the planned Tonopah Parkway, a north-south corridor centered on the 411th Avenue section line, from Interstate 10 (I-10) to the planned Northern Parkway. The Tonopah Parkway corridor within the project study area is approximately 3.75 miles long and two miles wide.

Details

Title
  • Northern Parkway/Tonopah Parkway Corridor Feasibility Study: Final Report
Date Created
2011-06
Identifier
  • Identifier Value
    XCMA 25.2:N 56/2
Note
  • Appendices include six Technical Memorandums.

Machine-readable links