Description
Given the context for BRT planning in the Valley, this project, the Comprehensive Arterial Bus Rapid Transit Planning Study, is tasked with identifying demand for BRT and defining operational characteristics, capital infrastructure needs, and fleet requirements. The study considers how operational characteristics and needs of the BRT corridors may change as the regional transit network develops over the life of the 20 year transit program.
Details
Title
- Regional Public Transportation Authority Comprehensive Arterial Bus Rapid Transit Planning Study
Contributors
- Parsons Brinckerhoff (Contributor)
Date Created
The date the item was original created (prior to any relationship with the ASU Digital Repositories.)
2009-09
Resource Type
Collections this item is in