Description

The purpose of the Phase I study is to evaluate existing drainage conditions and to identify alternative flood control/floodplain management strategies which warrant further consideration.

Downloads
pdf (20.1 MB)

Details

Title
  • Town of Sahuarita Basin Management Study: Phase I Report
Date Created
1999-11-30
Resource Type
  • Text
  • Identifier
    • Identifier Value
      XCPM 17.3:S 63/38
    Note

    Machine-readable links