Skip to main content

Production Scheduling and System Configuration for Capacitated Flow Lines with Application in the Semiconductor Backend Process


Abstract A good production schedule in a semiconductor back-end facility is critical for the on time delivery of customer orders. Compared to the front-end process that is dominated by re-entrant product flows, the back-end process is linear and therefore more suitable for scheduling. However, the production scheduling of the back-end process is still very difficult due to the wide product mix, large number of parallel machines, product family related setups, machine-product qualification, and weekly demand consisting of thousands of lots. In this research, a novel mixed-integer-linear-programming (MILP) model is proposed for the batch production scheduling of a semiconductor back-end facility. In the MILP formulation, the manufacturing process is m... (more)
Created Date 2011
Contributor Fu, Mengying (Author) / Askin, Ronald G (Advisor) / Zhang, Muhong (Advisor) / Fowler, John W (Committee member) / Pan, Rong (Committee member) / Sen, Arunabha (Committee member) / Arizona State University (Publisher)
Subject Industrial Engineering / Operations Research / Flexible Flow Shop / Heuristic / Optimization / Scheduling / Semiconductor Back-end Process / Stochastic Programming
Type Doctoral Dissertation
Extent 101 pages
Language English
Copyright
Reuse Permissions All Rights Reserved
Note Ph.D. Industrial Engineering 2011
Collaborating Institutions Graduate College / ASU Library
Additional Formats MODS / OAI Dublin Core / RIS


  Full Text
415.4 KB application/pdf
Download Count: 1575

Description Dissertation/Thesis