Description

This project consisted of multiple activities: Fish salvage, fish holding and repatriation, stream renovation, fish barrier construction and watershed stock tank renovations. Fish salvage and restocking operations were done in coordination and in conjunction with USFWS and a larger research

This project consisted of multiple activities: Fish salvage, fish holding and repatriation, stream renovation, fish barrier construction and watershed stock tank renovations. Fish salvage and restocking operations were done in coordination and in conjunction with USFWS and a larger research project being conducted by NAU through separate funding. Brief information on methods and results from those efforts are provided. The Department, utilizing resources provided directly by USBR and via a grant from the FWS, implemented holding facility construction and operation. The Department coordinated the stream renovation with planning and implementation assistance provided by all the aforementioned partners. The USBR conducted all activities related to the fish barrier design and construction, details of which will not be included in this report.

Downloads
pdf (5.7 MB)

Details

Title
  • Fossil Creek Native Fish Restoration Project: Final Project Report
Contributors
Date Created
2005-11
Resource Type
  • Text
  • Identifier
    • Identifier Value
      GF 3.2:F 57
    Note
    • Includes bibliographical references (p. 29).

    Citation and reuse

    Cite this item

    This is a suggested citation. Consult the appropriate style guide for specific citation guidelines.

    Weedman, D.A., P. Sponholtz and S. Hedwall. 2005. Fossil Creek Native Fish Restoration Project. Arizona Game and Fish Department, Phoenix Arizona.

    Machine-readable links